09/18/2020
Cone Zone Report: Everyone is working on the roads ahead of the rainy season.
Highway 1: San Luis Obispo County Line – Lime Creek Bridge: Sept. 21 – Sept. 25
One-way traffic controls will be in place along northbound and southbound Highway 1 from the San Luis Obispo County Line to Lime Creek Bridge for paving work from 8 a.m. to 3 p.m.
Highway 1: Gorda – Camaldoli Hermitage: Long-Term
There is indefinite long-term full closure of Highway 1 from Gorda to Sycamore Draw Bridge due to the wildfire in Big Sur.
Highway 1: Torre Canyon Bridge – South of Carpenter Street: Sept. 20 – Sept. 25
One-way traffic controls will be in place along northbound and southbound Highway 1 in Big Sur from the Torre Canyon Bridge to just south of Carmel Avenue for pavement rehabilitation work from 7 p.m. to 6 a.m. Motorists can expect delays between 10-20 minutes.
Daytime shoulder work will occur on Wednesday and Thursday starting at the Juan Higuera Creek Bridge, with a shifting 1-mile closure as work progresses in a northbound direction.
Daytime roadwork to replace guardrails and concrete barriers will also take place throughout next week at intermittent locations. Daytime work hours are 8 a.m. to 3 p.m. Motorists can expect delays of 5-10 minutes.
Highway 1: Molera Park Entr/Coast Road – Torre Canyon Bridge: Sept. 21 – Sept. 25
One-way traffic controls will be in place along northbound and southbound Highway 1 from the Molera Park Entrance/Coast Road to Torre Canyon Bridge for guardrail repair work from 8 a.m. to 4 p.m.
Highway 1: Molera Park Entr/Coast Road – Torre Canyon Bridge: Sept. 20 – Sept. 25
One-way traffic controls will be in place along northbound and southbound Highway 1 from the Molera Park Entrance/Coast Road to Torre Canyon Bridge for striping operation work from 7 p.m. to 6 a.m.
Highway 1: Carmel Valley Road – Molera Park Entr/Coast Road: Sept. 21 – Sept. 25
One-way traffic controls will be in place in the along northbound and southbound Highway 1 between Carmel Valley Road and Molera Park Entrance/Coast Road for guardrail work from 7 a.m. to 3 p.m.
Highway 1: Carmel Valley Road – Molera Park Entr/Coast Road: Sept. 20 – Sept. 25
One-way traffic controls will be in place in the evening along northbound and southbound Highway 1 between Carmel Valley Road and Molera Park Entrance/Coast Road for paving work from 7 p.m. to 6 a.m.
Highway 1: Fernwood – Molera Park Entrance/Coast Road: Sept. 21 – Sept. 25
One-way traffic controls will be in place along northbound and southbound Highway 1 from Fernwood to the Molera Park Entrance/Coast Road for tree work from 8:15 a.m. to 4:45 p.m.
Highway 1: Carpenter Street – Carmel Valley Road: Sept. 20 – Sept. 25
One nighttime lane closure will occur along northbound and southbound Highway 1 between Carpenter Street to Carmel Valley Road for paving work from 9 p.m. to 6 a.m.
Highway 1: Jensen Road – Santa Cruz County Line: September 20 – September 25
Alternating lane closures and full ramp closures will occur along northbound and southbound Highway 1 between Jensen Road and the Santa Cruz County Line for gore paving work. The closures will occur from 6 p.m. to 7 a.m.
Route 68: Laguna Seca Track Entrance – Laureles Grade: Sept. 21 – Sept. 24
One-way traffic controls will be in place along eastbound State Route 68 between the Laguna Seca Track Entrance and Laureles Grade for tree work 8 p.m. to 5 a.m.
Highway 101: Sala Road offramp – just past Sala Road: Sept. 21 – Sept. 24
One lane closure will occur along northbound Highway 101 at the Sala Road offramp at postmile 92.17 to just past Sala Road at postmile 92.67 for electrical work from 8:30 p.m. to 5:30 a.m.
Highway 101: Sala Road – West Laurel Drive: September 20 – September 24
There will be full closure of southbound Highway 101 and the ramps between West Laurel Drive and Sala Road for paving work from 9 p.m. to 4 a.m.
Highway 101: Boronda Road – Route 183 (North Main Street): Sept. 24 – Sept. 25
There will be full closure of southbound Highway 101 and the ramps between Boronda Road and Route 183 (North Main Street) for paving work from 9 p.m. to 4 a.m.
Highway 101: Alta Street/Old Stage Road – Little Bear Creek Bridge, Salinas: Long-Term
Nighttime lane closures (including median and shoulders) will occur along northbound and southbound Highway 101, between Alta Street/Old Stage Road and Little Bear Creek Bridge in Salinas for paving work on the roadway and ramps from 7 p.m. to 6 a.m. Crews will be working in the evenings Sunday – Thursday.
Highway 101: Layous – First Street, King City: Long-Term Closure
There will be one lane closure along northbound and southbound Highway 101 from Layous to First Street in King City for pavement work from 9:30 a.m. to 11:59 p.m.
Highway 101: Wild Horse Road – Highway 101: Long-Term
The on and off ramps lanes of northbound and southbound Wild Horse Road onto Highway 101 will be closed for paving work. Electronic messaging and detour signs will be in place to alert motorists.
Highway 101: Lockwood/San Lucas Road: Long-Term Closure
The on and off ramps on northbound & southbound Highway 101 at Lockwood/San Lucas Road will be closed for excavation work.
Highway 101: Lockwood/San Lucas – Paris Valley Road: Long-Term Closure
There will be one lane closure on northbound & southbound Highway 101 at Lockwood/San Lucas Road for excavation work.
Highway 183: Capitol Street – West Street: Sept. 21 – Sept. 25
One lane closure will occur along northbound and southbound Highway 183 between Capitol Street and West Street for pavement repair work from 9 a.m. to 3 p.m.
Old Stage Road: Gabilan Creek Bridge: Long-Term
Lane closures will occur along Old Stage Road for repair work on the Gabilan Creek Bridge, located approximately 1.25 miles northeast of Crazy Horse Canyon and Old Stage Road intersection from 7 a.m. to 6 p.m. During construction, motorist should anticipate lane closure traffic controls and delays of no more than 15 minutes, with one lane always open.
Bardin Road: Sycamore Road – Sconberg Parkway: September 21 – September 25
Intermittent construction work will occur along Bardin Road/Alisal Road between Sycamore Avenue, E. Alisal Street and Sconberg Parkway for water utilities work from 8 a.m. to 4:30 p.m. Motorists are advised that there may be single lane traffic flow and traffic controls in place at times in either direction as needed along portions of Bardin Road/Alisal Road and adjacent roadways.