This is a bit of a long one, but stick with us!
Putting conservation principles at the forefront of the repair and restoration of the Almonry is key to the success of the project. We are working with experts in heritage roofing and timber framing to ensure that the works meet the exacting standards for conservation.
During the latest site walkaround, the progress being made on the structural work was very evident! The infill panels are being removed, exposing the lathe, or in some cases wattle and daub, underneath. These panels have previously been filled in with cement which is not healthy for a timber frame building (but was once thought of as perfectly acceptable replacement for lime plaster) The panels will be repaired and filled in with lime plaster and then lime washed.
Removing the infill panels has allowed access to more of the timber frame and in some areas it is in very poor condition. The team are now talking about the best methods of repair while trying to retain as much of the historic fabric as possible.
The roof has undergone some repair work too! One of the larger roofs has no ridge (the beam across the top of the roof) The ridge was never there so adding one was not an option. To add strength to the roof, plywood braces have been added. This not only strengthens the roof but retains the original fabric of the building.
Finally a failing gable end to the building has been taken down ready to be rebuilt, giving us an unexpected view of the main hall on the first floor!