05/25/2026
The power on a transfer job sits on the yard lead while the conductor is lining switches for the reverse move into another yard track. It’s getting late in the afternoon and the chance of rain is increasing. They need to work with a sense of urgency if they want to avoid being caught in the yard when the rain starts.
A little later, a UP train lead by UP 2784 is operating over trackage rights, passes the Portland Yard office heading to the Port. This train will cross onto its own tracks in another mile or so down the line, before making the turn into the Port itself.